Odoo 20 brings a wide set of changes to the people side of the business. Working schedules can now follow irregular patterns, time off can be counted in calendar days, attendance check-outs can close at a fixed hour, and Payroll has been reorganised around a monthly dashboard and guided pay runs. Recruitment makes better use of the talent pool, and Appraisals can collect feedback from people outside the company.

If you run a business, manage a team or look after HR and payroll, these changes are aimed at you. Many of them remove repeated data entry, add checks before mistakes reach payslips, and give managers a clearer picture of who is working, who is away and who is ready for the next role. Below we walk through the most useful updates app by app, with short notes on where to find them.

Every feature below was checked against the Odoo 20 source code or tested on a live Odoo 20 database. Click any screenshot to see it full size.

Last updated 14 October 2026

15 new in Odoo 20

Payroll

15 features
01
NewEnterprise

Chatter on pay runs

Payroll > Payslips > Pay Runs

In Odoo 20 each pay run has its own chatter. From the Pay Runs list, payroll officers open a side panel for a pay run to post internal notes, send messages, schedule activities and read the pay run's history, such as when it was created and how its status changed. The panel is reached from the chat icon on the pay run card, next to the employee count. This keeps discussion and follow-up about a pay run attached to the pay run itself.

Why it matters Helps payroll teams keep notes, messages, activities and history together on each pay run.

How to use it

  1. Go to Payroll > Payslips > Pay Runs.
  2. Hover a pay run card.
  3. Click the chat icon next to the employee count.
Odoo 20 · Payroll
Pay Runs view with the chat icon opening the pay run chatter panel
02
ImprovedEnterprise

Contract date modification

Employees > Employee > Payroll tab

In Odoo 20, when a contract's start or end date is changed so that validated or paid payslips would fall outside the contract period, Odoo refuses to save the change. The warning shown includes a button that opens those payslips, which must be refunded, meaning corrected, before the new dates can be saved. This protects payroll history from becoming inconsistent with contract dates. The dates are edited on the Payroll tab of the employee form.

Why it matters Prevents contract date errors and helps identify payslips outside the new period for refund.

How to use it

  1. Go to Employees and open an employee with validated payslips.
  2. Open the Payroll tab.
  3. Change the contract date and save, choosing Correct terms.
Odoo 20 · Payroll
Contract date change prompt warning that 1 existing payslip must be corrected
03
ImprovedEnterprise

Dashboard

Payroll > Dashboard

The Odoo 20 Payroll dashboard is laid out as a monthly timeline of warning cards. Setup cards point to configuration still to do, such as the pay schedule, payslip layout or benefits. Control cards flag data problems, such as employees without a bank account or a contract, and attendance issues. Every card has a button that opens the records needing attention, so payroll officers can move straight from a warning to fixing it.

Why it matters Helps payroll teams track monthly tasks and act on warnings directly from the dashboard.

How to use it

  1. Go to Payroll > Dashboard.
  2. Click a card's button to open the records to fix.
Odoo 20 · Payroll
Payroll dashboard
04
ImprovedCommunity + Enterprise

Employee type per company or branch

Payroll > Configuration > Contracts > Employee Types

In Odoo 20 employee types such as Employee, Student or Intern are stored as records with an optional Company field. When a company or branch is set on a type, the type can only be used in that company or branch. When the field is left empty, the type is shared by all companies. Multi-company groups use this to keep country- or entity-specific employee types separate while sharing common ones.

Why it matters Lets multi-company businesses limit employee types to a company or branch, or share them.

How to use it

  1. Go to Payroll > Configuration > Contracts > Employee Types.
  2. Open a type.
  3. Set its Company, or leave it empty to share it.
Odoo 20 · Payroll
Employee type form with the optional Company field (empty means shared)
05
NewEnterprise

Net to gross simulation

Payroll > Employees > Salary Calculator

The Odoo 20 Gross-Net Salary Calculator accepts a salary entered as a net amount per month. Odoo then works out the gross wage, and the employer cost, that would result in that net pay, based on the chosen pay structure and working schedule. Payroll officers and HR use it to answer questions such as what gross salary is needed to pay a given net amount. The salary type is set to Net Per Month before entering the amount.

Why it matters Helps employers find the gross wage and employer cost needed to pay a desired net salary.

How to use it

  1. Go to Payroll > Employees > Salary Calculator.
  2. Set the salary type to Net Per Month.
  3. Enter an amount.
Odoo 20 · Payroll
Salary Calculator deriving gross and company cost from a Net Per Month amount
06
ImprovedEnterprise

Pay run workflow

Payroll > Payslips > Pay Runs > New

Creating a pay run in Odoo 20 follows guided steps. Clicking New opens a dialog to choose employee types, the pay structure and the period. Continue leads to the selection of employees, and a Before You Start check then lists any pending issues before payslips are generated. Each pay run card shows its status and only the next relevant action, such as Validate, Pay or Mark as Paid, so payroll officers always know the following step.

Why it matters Guides payroll staff step by step through creating pay runs with a checklist before starting.

How to use it

  1. Go to Payroll > Payslips > Pay Runs > New.
  2. Choose employee types, structure and period.
  3. Click Continue and select employees.
Odoo 20 · Payroll
New Pay Run guided dialog: employee types, pay structure and period
07
NewEnterprise

Payslip sending options

Payroll > Configuration > Settings

Odoo 20 Payroll has a setting that controls when payslip PDFs are generated and emailed to employees. The choices are When Confirmed, When Paid, or Manually. With Manually selected, nothing is sent automatically and the pay run shows a Send by email button that the payroll officer clicks when ready. The setting is named Send payslips to employees and is found in the Payroll settings.

Why it matters Lets payroll teams choose whether payslips are emailed on confirmation, on payment, or manually.

How to use it

  1. Go to Payroll > Configuration > Settings.
  2. Find Send payslips to employees.
  3. Choose When Confirmed, When Paid or Manually.
Odoo 20 · Payroll
Payroll settings: Send payslips to employees (When Confirmed, When Paid, Manually)
08
ImprovedEnterprise

Payslip UX

Payroll > Payslips > Payslip > Salary Computation

The Salary Computation tab of an Odoo 20 payslip shows the lines that matter for that payslip. Obvious values, such as totals of empty categories, are greyed out, and columns with no values are hidden. A Show all toggle displays every line again when the full detail is needed. This makes payslips easier to review for payroll officers while keeping the complete computation available on demand.

Why it matters Helps payroll staff review payslips faster by showing only relevant salary lines.

How to use it

  1. Go to Payroll > Payslips.
  2. Open a payslip.
  3. Open the Salary Computation tab; use Show all if needed.
Odoo 20 · Payroll
Payslip Salary Computation tab with greyed values and the Show all toggle
09
ImprovedEnterprise

Salary indexation

Employees > Actions > Salary Increase

Odoo 20 has a Salary Increase action that can be run on one or several employees at once. It asks for an effective date, an increase rate, whether the rate applies to the full wage or to a capped wage, and an additional fixed amount. Odoo then creates new contract versions with the raised salaries and offers to correct payslips that are already affected by the change. HR uses it for yearly indexation or general raises.

Why it matters Lets HR apply salary increases to many contracts at once with dates, percentages and caps.

How to use it

  1. Go to Employees and select employees.
  2. Open Actions > Salary Increase.
  3. Enter date, rate, cap and fixed amount.
Odoo 20 · Payroll
Bulk Salary Increase wizard with date, rate, Full/Capped Wage and extra amount
10
ImprovedEnterprise

Salary rules

Payroll > Configuration > Salary > Rules

In Odoo 20 a salary rule has a Categories field and a Pay Structures field, and each accepts several values. One rule can therefore count towards several totals and be used by several pay structures, instead of being copied for each structure. This reduces the number of duplicated rules that payroll administrators have to maintain. Rules are managed from the Salary Rules menu in the Payroll configuration.

Why it matters Reduces duplicate setup by sharing one salary rule across several categories and pay structures.

How to use it

  1. Go to Payroll > Configuration > Salary > Rules.
  2. Open or create a rule.
  3. Set several Categories and Pay Structures.
Odoo 20 · Payroll
Salary Rules list with multi-value Pay Structures and Categories tag fields
11
ChangedCommunity + Enterprise

Time entry exports

Employees > Actions > Export Time Entries

Odoo 20 offers a single Export Time Entries action on employees. It exports one month of time entries for the selected employees in one common file format, the same for every payroll provider. The action is used from the Employees list: select the employees, open Actions and choose Export Time Entries. The result covers the whole month for each selected employee in a standard layout.

Why it matters Lets payroll teams export a month of employee time entries in one standard-format action.

How to use it

  1. Go to Employees and select employees.
  2. Open Actions > Export Time Entries.
Odoo 20 · Payroll
Export Time Entries wizard selecting a Month and Year for 32 employees
12
RemovedCommunity + Enterprise

Work entries removal

Payroll > Configuration > Time Management > Time Types

In Odoo 20 there are no work entry records and no bridge between Planning and Payroll. Payslips read time off and working schedules directly. Work entry types and time off types are combined into one Time Type. Its form has a Time Off tab, covering approval and allocation, and a Payroll tab, both on the same record. Payroll administrators manage these types from the Time Management section of the Payroll configuration.

Why it matters Use Time Types instead of separate work entry and time off types; work entry records are gone.

How to use it

  1. Go to Payroll > Configuration > Time Management > Time Types.
  2. Open a type to see its Time Off and Payroll tabs.
Odoo 20 · Payroll
Payroll configuration: Time Types
13
ImprovedCommunity

Working schedules

Payroll > Configuration > Time Management > Working Schedules

In Odoo 20 a working schedule line can hold only a number of hours per day. The start and end times are left empty and the daily hours are entered instead, for example 7h30 on each day from Monday to Friday. This suits employees whose contract defines daily hours rather than fixed working times. Schedules are created or edited from the Working Schedules menu in the Time Management section of the Payroll configuration.

Why it matters Lets companies define working schedules by daily hours without specific start and end times.

How to use it

  1. Go to Payroll > Configuration > Time Management > Working Schedules.
  2. Open or create a schedule.
  3. Enter hours per day, leaving start and end empty.
Odoo 20 · Payroll
Working schedule lines giving only hours per day, without start and end times
14
ImprovedEnterprise

Driver assignment

With the Belgian payroll localization in Odoo 20, the company car chosen in a salary package offer is applied to the vehicle in Fleet. When the employee signs the offer, they become the car's future driver, and once every party has signed they become its driver. The vehicle's driver in Fleet therefore follows the car selected for the employee. This requires the l10n_be_hr_contract_salary module and a salary package offer that includes a company car.

Why it matters Keeps Fleet driver records updated automatically when Belgian employees choose a car in their salary package.

How to use it

  1. Install the Belgian payroll localization.
  2. Send a salary package offer with a company car and have it signed.
  3. Check the car's driver in Fleet.
15
NewEnterprise

Test print pay runs

Payroll > Payslips > Pay Runs

A pay run in the Ready state in Odoo 20 offers a Test Print action. It produces draft PDF payslips for every employee in the pay run and attaches each PDF to the chatter of the matching payslip. Payroll officers can open these drafts and check the figures and layout before validating the pay run, without sending anything to employees. The action is found in the menu of a Ready pay run.

Why it matters Lets payroll teams review draft payslip PDFs before finalizing a pay run.

How to use it

  1. Go to Payroll > Payslips > Pay Runs.
  2. Open the menu of a Ready pay run.
  3. Choose Test Print.

8 new in Odoo 20

Attendances

8 features
16
ImprovedCommunity

Automatic check-out time

Settings > Attendances > Automatic Check-Out

Automatic Check-Out can be based on a Specific Time, such as 8:00 PM, as an alternative to a tolerance after scheduled hours. At that time, a job checks out every attendance that is still open, including those of employees on flexible schedules. Administrators choose this option in the Attendances settings, under Automatic Check-Out, and then set the time at which open attendances are closed.

Why it matters Ensures employees on flexible schedules are checked out automatically at a set time.

How to use it

  1. Go to Settings > Attendances.
  2. Under Automatic Check-Out, choose Specific Time.
  3. Set the time.
Odoo 20 · Attendances
Attendance settings: Automatic Check-Out based on a Specific Time
17

Color-coded indicators in Gantt view

In the attendance Gantt view, colour-coded indicators show whether an employee's hours are underworked, as expected, or overtime. Managers can see at a glance how the hours recorded compare with what was expected for each employee.

Why it matters Helps managers spot underworked, expected and overtime hours at a glance.
Odoo 20 · Attendances
Attendance Gantt with colour-coded hour indicators: green under, orange overtime
18
NewCommunity

Photo at check-in

Settings > Attendances > Take Pictures on Check-In

A setting lets Odoo take a picture with the device camera when an employee checks in from the kiosk or from the systray. The photo helps confirm the identity of the person checking in. Administrators switch it on in the Attendances settings with the 'Take Pictures on Check-In' option, after which it applies to check-ins made through both of these entry points.

Why it matters Helps verify who checks in by taking an employee photo at the kiosk or systray.

How to use it

  1. Go to Settings > Attendances.
  2. Enable Take Pictures on Check-In.
Odoo 20 · Attendances
Attendance settings: Take Pictures on Check-In option
19
ChangedCommunity

Prevent app use

Settings > Users > Access Rights > Human Resources > Attendances

Access to the Attendances app menu requires an attendance access right, and users without one cannot open the app. A 'Self Attendance Edit' level lets users manage their own attendance records without wider rights. Administrators set the level for each user on the Access Rights tab of the user form, in the Human Resources section under Attendances, choosing what each person may do.

Why it matters Helps control who uses Attendances through access levels, including Self Attendance Edit.

How to use it

  1. Go to Settings > Users and open a user.
  2. Open the Access Rights tab.
  3. Set the Human Resources > Attendances level.
Odoo 20 · Attendances
User access rights: Attendances levels No and Self Attendance Edit
20
ImprovedCommunity

Public holiday option ruleset

Attendances > Configuration > Automatic Rules > Work Days > Public Holidays

Rules can target public holidays. Next to the weekday settings, each automatic rule has a Public Holidays condition, so work done on a public holiday can receive a different time type, such as an overtime rate. Organisations use it to count or pay holiday work separately from normal days. The condition is in the Work Days section of a rule in the Attendances configuration.

Why it matters Lets businesses apply specific overtime rates and conditions on public holidays.

How to use it

  1. Go to Attendances > Configuration > Automatic Rules.
  2. Open a rule.
  3. Set the Public Holidays condition under Work Days.
Odoo 20 · Attendances
Time rule Work Days with the Public Holidays condition and hour range
21

Single check-in mode

An optional mode records only the first check-in of an employee during working hours. It is meant to be used together with automatic check-out, which then closes the open attendance afterwards.

Why it matters Lets businesses record only the first check-in during working hours, paired with automatic check-out.
Odoo 20 · Attendances
Attendance settings: Single Check-In Attendance System option under Automatic Check-Out
22

Time-based filters

Attendance records can be filtered and grouped by working schedule and by day. Managers can use these filters and groupings to review attendance for a given schedule or for a particular date.

Why it matters Helps managers analyse attendance by working schedule and by day.
Odoo 20 · Attendances
Attendances grouped by Working Schedule and then by Day
23

eSSL and Mantra integration

Biometric devices from eSSL and Mantra can send attendance records directly to Odoo. Check-ins captured on these devices are recorded in the Attendances app without anyone having to enter them by hand.

Why it matters Lets businesses record attendance in Odoo directly from eSSL and Mantra biometric devices.

5 new in Odoo 20

Employees

5 features
24
ImprovedCommunity

Employee directory

Employees > Directory

In a multi-company database, the employee Directory shows employees of all companies, whatever companies the user has access to. A Company panel on the left lets users browse employees across the whole organisation. A user restricted to one company can therefore still look up colleagues who work for the other companies of the group from the Directory menu of the Employees app.

Why it matters Helps multi-company businesses find employees across all companies in one directory.

How to use it

  1. Go to Employees > Directory.
  2. Use the Company panel on the left to browse other companies.
Odoo 20 · Employees
Employee Directory listing employees of all companies with a Company filter panel
25
ImprovedEnterprise

Salary simulation

Employees > [employee form] > Simulation button

The employee form has a Simulation button in its header. It opens the salary simulator with the data relevant to that employee already filled in, so the salary can be simulated without entering the details again. It is an Enterprise feature available on employee records in the Employees app, used by HR staff preparing salary proposals for a specific person.

Why it matters Lets HR simulate an employee's salary quickly from the employee form.

How to use it

  1. Go to Employees and open an employee.
  2. Click Simulation in the form header.
Odoo 20 · Employees
Employee form header with the new Simulation button
26
ChangedCommunity

Remote Work

Employees > [employee] > Work tab > Location group

Remote work settings are part of the Employees app; there is no separate Remote Work module. On the employee's Work tab, a Location group shows the usual work location and a location field for each weekday. HR staff and managers use it to record where each employee works on each day of the week, directly on the employee form in the Employees app.

Why it matters Find remote work locations on the employee Work tab instead of a separate app.

How to use it

  1. Go to Employees and open an employee.
  2. Open the Work tab.
  3. Set locations in the Location group.
Odoo 20 · Employees
Employee Work tab with the Location group for daily work locations
27
NewCommunity + Enterprise

Variable working schedule

Employees > Configuration > Working Schedules

Working schedules can be of the Variable type. Instead of a weekly pattern that repeats, work periods are drawn on specific dates directly in a calendar, which suits rotations and other irregular patterns. Schedules are created in the Employees configuration by setting Calendar Type to Variable and clicking in the week calendar to add work periods on the exact dates they apply to.

Why it matters Lets businesses plan irregular work periods for employees in a calendar.

How to use it

  1. Go to Employees > Configuration > Working Schedules.
  2. Click New and set Calendar Type to Variable.
  3. Click the week calendar to add dated work periods.
Odoo 20 · Employees
Working schedule: Calendar Type
28

Single-signer HR documents

HR users can sign documents that need only one signer, with the employee's details already filled in. Once the HR user has signed, the documents are sent on to the employee concerned.

Why it matters Speeds up HR paperwork by pre-filling employee details on documents to sign and send.

5 new in Odoo 20

Time Off

5 features
29
NewCommunity

Calendar day vs working day deductions

Time Off > Configuration > Time Types > [type] > Time Off tab > Count Days as

In Odoo 20 each time type has a Count Days as option. With Working Days, the length of a request depends on the employee's working schedule, so only scheduled days are counted. With Calendar Days, every day is counted, weekends included, so a full week always counts as seven days. HR managers choose the option per time type in the Configuration part of its Time Off tab.

Why it matters Lets HR count time off in working days or calendar days to match company policy.

How to use it

  1. Go to Time Off > Configuration > Time Types and open a type.
  2. In the Time Off tab, find Count Days as.
  3. Choose Working Days or Calendar Days.
Odoo 20 · Time Off
Time type Count Days as option: Working Days or Calendar Days
30
ImprovedCommunity

Minimal amount for time-off requests

Time Off > Configuration > Time Types > [type] > Duration Type

In Odoo 20 the Duration Type of a time type sets the smallest amount an employee can request. With Full Day, only whole days can be requested. With Half-Day, the request form offers Full Day, Morning or Afternoon. With Custom Hours, any duration can be entered. HR managers set it on the time type, and employees see the matching choices when they create a request of that type.

Why it matters Lets HR set whether employees request time off in full days, half days or custom hours.

How to use it

  1. Go to Time Off > Configuration > Time Types and open a type.
  2. Set Duration Type.
  3. Create a request of that type to check the durations.
Odoo 20 · Time Off
Time type form with Duration Type: Full Day, Half-Day or Custom Hours
31
ImprovedEnterprise

Overview: all employees

Time Off > Overview

The Odoo 20 Time Off Overview, a Gantt view, lists every employee, including those who have no time off in the period shown. This holds as long as the search only filters on employees. Managers can see the whole team on one chart, with empty rows for people without leave, which makes it easier to check coverage across a period.

Why it matters Helps managers plan coverage by seeing every employee in the time-off overview.

How to use it

  1. Go to Time Off > Overview.
  2. Use the Gantt view to see all employees.
Odoo 20 · Time Off
Time Off Overview Gantt listing every employee, including those without leave
32

Public holidays

In Odoo 20 every localization has a Public Holiday time type by default. Odoo suggests the yearly public holidays for the company's country and can load them. The source gives no menu path for this.

Why it matters Saves HR setup time by suggesting and loading the company country's yearly public holidays.
Odoo 20 · Time Off
Time Types list with the default Public holiday time type
33
ChangedCommunity

Prevent app use

Settings > Users > [user] > Access Rights > Human Resources > Time Off

Odoo 20 Time Off has an Employee access level, and the user form offers No as a choice for Time Off. A user set to No cannot open the Time Off application. Administrators use this to keep the app hidden from users who should not use it. The setting is in the Human Resources section of the user's access rights.

Why it matters Lets administrators block chosen users from accessing the Time Off app.

How to use it

  1. Go to Settings > Users and open a user.
  2. Open Access Rights.
  3. Under Human Resources > Time Off, choose No.

5 new in Odoo 20

Appraisals

5 features
34

Bulk actions

Several appraisals can be handled in one go: they can be confirmed, emailed, marked as done or reset together. HR users can therefore apply the same action to a selection of appraisals at once.

Why it matters Saves HR time by confirming, emailing, completing or resetting several appraisals at once.
Odoo 20 · Appraisals
Actions menu on 10 selected appraisals: Send By Email, Confirm, Mark as Done, Reset
35
ImprovedEnterprise

External 360 feedbacks

Appraisals > Appraisals > [Appraisal Name] > Ask Feedback

The Ask Feedback wizard accepts any contact as a recipient, not only employees. Managers can request 360 feedback from customers, partners or other external contacts together with internal colleagues. The wizard opens from the Ask Feedback button on an ongoing appraisal, where external contacts are added in the Recipients field alongside employees. The feedback request is then sent to all recipients.

Why it matters Lets companies gather appraisal feedback from customers and partners, not just employees.

How to use it

  1. Go to Appraisals and open an ongoing appraisal.
  2. Click Ask Feedback.
  3. Add external contacts to Recipients.
Odoo 20 · Appraisals
Ask Feedback Recipients list including external companies and partner contacts
36
ImprovedEnterprise

Smart template selection

Appraisals > Configuration > Templates; Appraisals > New

A new appraisal is filled automatically with the template that suits the employee's department. Odoo uses the first template linked to that department, or otherwise the first template that is not tied to any department. HR officers link templates to departments in the Appraisals configuration, and the right template is applied as soon as they create an appraisal for an employee.

Why it matters Saves setup time by applying the department's appraisal template automatically.

How to use it

  1. Go to Appraisals > Configuration > Templates.
  2. Link templates to departments.
  3. Create a new appraisal to see the template applied.
Odoo 20 · Appraisals
Appraisal template Departments field that links a template to departments for auto-selection
37
ImprovedEnterprise

Next appraisal date

Employees > [Employee Name]

Managers without HR or Appraisal access rights can view and edit the next appraisal date of their team members on the employee profile. They can follow and plan reviews for their direct reports without needing higher access rights. The Next Appraisal Date field is on the employee form of each direct report in the Employees app, visible with standard manager permissions.

Why it matters Lets managers plan their team's next appraisals without HR or Appraisal rights.

How to use it

  1. Log in as a manager.
  2. Go to Employees and open a direct report.
  3. View or edit the Next Appraisal Date.
38
NewEnterprise

Parent goal progression

Appraisals > Goals > [Parent Goal Name]

Parent goals compute their progress automatically as the average of their sub-goals. The progress buttons are hidden on parent goals, and a parent goal is completed only when all of its sub-goals are marked as complete. Managers and employees follow overall progress by opening the parent goal in the Goals menu of the Appraisals app, where the computed percentage is displayed.

Why it matters Helps managers track overall goal progress automatically from its sub-goals.

How to use it

  1. Go to Appraisals > Goals.
  2. Create a parent goal with several sub-goals.
  3. Open the parent goal to see its progress.

4 new in Odoo 20

Recruitment

4 features
39
ImprovedCommunity + Enterprise

Improved integration

Recruitment > Applications > Talents filter

In Odoo 20 talents, which are profiles in a talent pool, are closely linked to their applications. A talent form has an Apply to Jobs button listing each job with the talent's matching score, and a job has a Matching Talents button. Shared data, such as contact details and skills, is kept in sync between a talent and its applications, so recruiters do not need to update the same information twice.

Why it matters Helps recruiters keep talent and application contact details, skills and matching scores in sync.

How to use it

  1. Go to Recruitment > Applications and use the Talents filter.
  2. Open a talent.
  3. Click Apply to Jobs.
Odoo 20 · Recruitment
Talent record with Apply to Jobs button and linked Applications smart button
40
ImprovedCommunity + Enterprise

Job form visibility conditions

Website > Jobs > application form > Edit > Field options

In the Odoo 20 website form editor, a field on the job application form can be shown only when the Job field contains one of several chosen jobs. The Contains condition on a record field offers a list of values with a toggle for each. Recruiters use it to ask job-specific questions on one shared application form, so applicants only see fields relevant to the position they pick.

Why it matters Lets recruiters show only relevant application form fields for each job position.

How to use it

  1. Go to Website, open a job application page and click Edit.
  2. Select a field and set Visibility Rule to Visible only if.
  3. Choose Job and Contains, then toggle the jobs.
Odoo 20 · Recruitment
Website editor: application form field Visible only if Job is a selected position
41
ImprovedCommunity + Enterprise

Matching score filter

Recruitment > Applications > Search panel

In Odoo 20 the matching score of an applicant, which compares their skills and degree with the job requirements, is stored on the application. The Applications search offers a Matching Score filter with thresholds of 80%, 70%, 60% and 50%. Recruiters use it to list only the applicants who meet a chosen level of fit for the job, which helps when reviewing many applications.

Why it matters Helps recruiters focus on applicants whose matching scores meet a chosen threshold.

How to use it

  1. Go to Recruitment > Applications.
  2. Open the search options.
  3. Pick a threshold under Matching Score.
Odoo 20 · Recruitment
Matching Score filter with 80/70% thresholds beside the applicants Matching Score column
42
ImprovedCommunity + Enterprise

View talents from job position

Recruitment > Configuration > Job Positions

In Odoo 20 a job position has a Matching Talents button. It opens the talents in the pool who are not yet linked to that job, together with their matching and missing factors, meaning the skills they have or lack for the position. Recruiters use it to find suitable candidates already in their talent pool before looking for new applicants.

Why it matters Helps recruiters find pool talents for a job and see their matched and missing skills.

How to use it

  1. Go to Recruitment > Configuration > Job Positions and open a job.
  2. Click Matching Talents.
  3. Use Search more in the Talents field.
Odoo 20 · Recruitment
Job position: Matching Talents

1 new in Odoo 20

Referrals

1 features
43
ImprovedEnterprise

Contact outreach tracking

Recruitment > Job Positions > [open job] > Promote; Referrals > Reporting > Link Tracker

In Odoo 20, when a job is promoted to employees with the Promote button on the job form, the job's chatter records which employees were sent the promotion email. Employees can also open a Referral Link Tracker that counts the clicks on each link they shared. The source did not find a separate counter of how many people were contacted. Recruiters and referring employees use these to follow job promotion activity.

Why it matters Helps recruiters see which employees were emailed about a job and lets employees track their link clicks.

How to use it

  1. Go to Recruitment > Job Positions and open a published job.
  2. Click Promote, pick employees and send.
  3. Check the job chatter for contacted employees.
Odoo 20 · Referrals
Job Promote campaign choosing employee recipients and a tracked job link

1 new in Odoo 20

Fleet

1 features
44
ImprovedEnterprise

Driver assignment

Payroll app > Employee contract > Company Car field

For Belgian companies using Odoo 20 Payroll, picking a new Company Car on an employee contract sets the employee as that car's Future Driver in Fleet, and clears the Future Driver of the previous car. The Driver field itself is not set automatically from payroll; the fleet officer confirms the change. The source could not verify that the current driver is replaced directly.

Why it matters Keeps car driver records current automatically when a company car is chosen for an employee in Payroll.

How to use it

  1. Open an employee contract in Payroll (Belgian company).
  2. Change Company Car.
  3. In Fleet, check the car's Future Driver.

1 new in Odoo 20

Frontdesk

1 features
45
NewEnterprise

Member entry management

Frontdesk > Stations

The Frontdesk Partnership module adds a Type to each frontdesk station: Guests or Members. A Members frontdesk admits contacts who scan their personal barcode, but only if they hold one of the partner grades, or membership tiers, chosen on the station. A passback timeout stops the same badge from being reused straight away. The module installs automatically with Partnership, and members check in through the station's kiosk.

Why it matters Helps venues admit only qualifying members through personal barcodes with passback protection.

How to use it

  1. Install Partnership; Frontdesk Partnership installs automatically.
  2. Go to Frontdesk > Stations, open a station, set Type to Members.
  3. Choose the allowed Grades, then click Open Kiosk.
Odoo 20 · Frontdesk
Members-type station with allowed grades and barcode passback timeout

put it to work

Implement Odoo 20 HR & Payroll

keep exploring

Odoo 20 in other business areas

Odoo 20 HR & Payroll questions

  • How many new HR & Payroll features are in Odoo 20?

    45 across 9 apps, 7% of the 637 new features in the release by TechUltra's count. By app: Payroll (15), Attendances (8), Employees (5), Time Off (5), Appraisals (5), Recruitment (4), Referrals (1), Fleet (1), Frontdesk (1).

  • What are the biggest HR & Payroll changes in Odoo 20?

    In Payroll, dashboard: helps payroll teams track monthly tasks and act on warnings directly from the dashboard. In Attendances, automatic check-out time: ensures employees on flexible schedules are checked out automatically at a set time. In Employees, variable working schedule: lets businesses plan irregular work periods for employees in a calendar.

  • How do we get the Odoo 20 HR & Payroll features?

    If you run Odoo 16, 17, 18 or 19, they arrive with the upgrade to Odoo 20. A free written assessment lists your modules, the risks in your build and a fixed price. If you are new to Odoo, start directly on Odoo 20 with a fixed-price implementation, priced after a one-week discovery.

Sources: features, steps and the 37 screenshots are from TechUltra's Odoo 20 feature guide. Counted by TechUltra's Odoo team from the Odoo 20 source code and a live Odoo 20 database; industry packages are based on Odoo's official release notes. Localization changes are not included.

ready when you are

Planning your move to Odoo 20?

Book a free 30-minute call with a TechUltra senior consultant for a process review or a clear upgrade path from Odoo 16, 17, 18 or 19.