Employee-specific materials
Planning > Configuration > Materials
A material resource such as a van, a tool or a machine can be given an Assigned To employee in Planning. Whenever that employee is placed on a shift, the material is added automatically to the resources of the same shift. In practice, a technician's van or equipment is booked together with the technician, so planners do not need to add it to each shift separately.
How to use it
- Go to Planning > Configuration > Materials.
- Set Assigned To on a material.
- Assign that employee to a shift to see the material added.