What's new in Odoo 20 Projects & Services

One planner for people, shifts and field work.

37 new features
5 apps covered
29 screenshots

Odoo 20 brings a broad set of updates to the apps that service businesses rely on every day. Project gains printable schedules, a direct path from CRM deals to delivery, and better ways to work with customers through the portal. Planning takes on a much bigger role, because field service now lives inside it, complete with maps, automatic planning and travel billing. Timesheets adds an assistant that suggests entries from tracked activity, and Helpdesk picks up tools to keep tickets moving.

These changes matter most to business owners and managers who coordinate people, time and customer work. Project managers get clearer reporting and smoother handovers. Dispatchers and planners get a single place to schedule technicians and equipment. Employees spend less effort logging hours, and support teams get help spotting tickets that need attention. Below we walk through the most useful updates in each app, followed by a short list of other notable additions.

Every feature below was checked against the Odoo 20 source code or tested on a live Odoo 20 database. Click any screenshot to see it full size.

Last updated 14 October 2026

20 new in Odoo 20

Planning

20 features
01
NewEnterprise

Employee-specific materials

Planning > Configuration > Materials

A material resource such as a van, a tool or a machine can be given an Assigned To employee in Planning. Whenever that employee is placed on a shift, the material is added automatically to the resources of the same shift. In practice, a technician's van or equipment is booked together with the technician, so planners do not need to add it to each shift separately.

Why it matters Saves planners time by adding an employee's assigned materials to their shifts automatically.

How to use it

  1. Go to Planning > Configuration > Materials.
  2. Set Assigned To on a material.
  3. Assign that employee to a shift to see the material added.
Odoo 20 · Planning
Materials list with the new Assigned To employee column
02
ImprovedEnterprise

Field Service: auto plan

Planning > Configuration > Settings; Planning > Schedule > By Resource > Actions > Auto Plan

When Field Service is enabled, the Auto Plan action takes into account the geolocation of each customer address. Shifts are matched to technicians with travel distance in mind, in addition to their availability and roles. Planners run it from the By Resource schedule to fill open shifts with technicians who are well placed to reach the customer. The setting is made once in the Planning configuration.

Why it matters Helps dispatchers assign shifts efficiently by factoring in customer locations.

How to use it

  1. Go to Planning > Configuration > Settings and enable Field Service.
  2. Open Planning > Schedule > By Resource.
  3. Click Actions > Auto Plan.
Odoo 20 · Planning
Planning Schedule by Resource: Actions menu with Auto Plan option
03
NewEnterprise

Field Service: customer ratings

Planning > Reporting > Customer Ratings

After an onsite intervention, customers can rate the service. Ratings are collected for each shift and listed in a Customer Ratings menu under Reporting, showing the technician, the customer and the comment left. Managers use this report to follow customer satisfaction for field work. The feature depends on the Field Service and Customer Ratings settings being enabled. Ratings are tied to individual shifts.

Why it matters Helps service companies measure customer satisfaction with onsite interventions.

How to use it

  1. Enable Field Service in Planning > Configuration > Settings.
  2. Enable Customer Ratings.
  3. Go to Planning > Reporting > Customer Ratings.
Odoo 20 · Planning
New Customer Ratings report under Planning Reporting for intervention feedback
04
ImprovedEnterprise

Field Service: intervention confirmation email

Planning > Configuration > Settings > Operations > Confirmation Email

A Confirmation Email setting in the Planning settings controls whether customers automatically receive an email when their intervention shift is published. The setting also lets the administrator choose which email template is used for that message. It is found in the Operations section of the Planning configuration settings. Administrators set it in the Planning configuration, and it then applies whenever an intervention shift is published to the customer.

Why it matters Lets businesses decide whether customers get automatic confirmation emails for published interventions.

How to use it

  1. Go to Planning > Configuration > Settings.
  2. Open the Operations section.
  3. Set Confirmation Email and choose the email template.
Odoo 20 · Planning
Planning settings: Confirmation Email option with email template for published shifts
05
NewEnterprise

Field Service: live map

Planning > Maps > Live Map

The Live Map in the Planning Maps menu shows where each technician is located, next to the list of their current interventions. Technician positions come from their check-ins with geolocation. Dispatchers use it to see who is where during the day. It requires Field Service to be enabled in the Planning settings. The map is found in the Maps menu of the Planning app.

Why it matters Helps dispatchers see where technicians are right now.

How to use it

  1. Enable Field Service in Planning > Configuration > Settings.
  2. Go to Planning > Maps > Live Map.
  3. Review technician positions and current interventions.
Odoo 20 · Planning
Live Map showing technician locations with their current interventions listed
06
ImprovedEnterprise

Field Service: map view

Planning > Maps > Timeline

The map timeline, found under Maps > Timeline, combines a map of shift addresses with a timeline of each technician's day. Planners can see where interventions take place and which technicians are free at a given time in one screen. It is available once Field Service is enabled in the Planning settings. Planners use it when deciding which technician to send to a visit.

Why it matters Helps dispatchers match shift locations with technician availability on a map.

How to use it

  1. Enable Field Service in Planning > Configuration > Settings.
  2. Go to Planning > Maps > Timeline.
  3. Compare shift locations with technician availability.
Odoo 20 · Planning
Maps Timeline view combining shift map with technicians' daily schedule timeline
07
ImprovedEnterprise

Field Service: report

Planning > (shift) > Print > Field Service Report

Custom fields added with Studio to the worksheet part of a shift are printed on the intervention report. They are also shown on the customer portal, grouped in the same way as on the shift form. This lets companies include their own data in the report given to customers. Field Service and Worksheets must be enabled. The report is printed from the shift.

Why it matters Lets businesses include their custom Studio fields on printed field service reports.

How to use it

  1. Enable Field Service and Worksheets in Planning settings.
  2. Add Studio fields to the shift worksheet.
  3. Print the intervention report from the shift.
Odoo 20 · Planning
Shift action menu with the Field Service Report print option
08
NewEnterprise

Field Service: track customer history

Planning > shift > Equipment > View Shifts

Shifts list the customer's equipment, identified by serial numbers. From an equipment card, a user can open all the shifts performed on that item, giving the full intervention history of the machine. Technicians and planners use this to see past work before a visit. Field Service and Equipment must be enabled. Planners and technicians find View Shifts on the equipment cards shown on the shift form.

Why it matters Helps technicians see past interventions on a customer's equipment.

How to use it

  1. Enable Field Service and Equipment in Planning settings.
  2. Open a shift.
  3. Click View Shifts on an equipment card.
Odoo 20 · Planning
Shift form Equipment tab listing customer equipment by lot or serial number
09
NewEnterprise

Field Service: travel fees

Planning > Configuration > Settings > Travel Fees

A Travel Fees setting adds travel costs to the invoice of interventions. The administrator chooses between a Fixed Fee based on travel time and a Fee per Distance, and selects the product used to invoice the travel. The fee is then included when interventions are invoiced to the customer. The setting is located in the Travel Fees section of the Planning configuration settings and is used for interventions invoiced to customers.

Why it matters Lets businesses bill customers for travel by distance or a fixed travel-time fee.

How to use it

  1. Go to Planning > Configuration > Settings.
  2. Open Travel Fees.
  3. Choose Fixed Fee or Fee per Distance and the invoicing product.
Odoo 20 · Planning
Planning settings: Travel Fees with Fixed Fee or Fee per Distance and product
10
NewEnterprise

Field Service: website form

Website > /service-requests; Planning > Schedule > Service Requests

A website page at /service-requests lets customers describe the service they need and enter their address. Each submission becomes an unscheduled shift listed under Schedule > Service Requests, where a dispatcher plans it. Customers cannot book a time slot themselves; scheduling stays with the company. The request form is published on the website, and submitted requests wait in the Service Requests menu until a dispatcher gives them a date and a technician.

Why it matters Lets customers submit service requests online for the team to schedule.

How to use it

  1. Open the website page /service-requests.
  2. Submit a request as a customer.
  3. Go to Planning > Schedule > Service Requests to plan it.
Odoo 20 · Planning
Service Requests list of unscheduled shifts submitted through the website form
11
ChangedEnterprise

Field Service: worksheets

Planning > Configuration > Worksheet Templates; Shift Templates > Worksheet Template

Worksheet templates define their questions as property fields stored on the template. When a worksheet is filled on a shift, the answers are saved as property values, so no separate Studio model is created for each template. Shift templates have a Worksheet Template field, so shifts created from a shift template come with the right worksheet. Field Service and Worksheets must be enabled.

Why it matters Lets businesses attach custom worksheet templates to shift templates for consistent reporting.

How to use it

  1. Enable Field Service and Worksheets in Planning settings.
  2. Go to Planning > Configuration > Worksheet Templates.
  3. Set a Worksheet Template on a shift template.
Odoo 20 · Planning
Worksheet template built from property fields grouped in sections
12
ImprovedEnterprise

Link shifts to tasks

Planning > Planning > All > shift

Shifts linked to a project have a Task field, so planners can schedule the exact project task someone will work on during the shift. The task is selected on the shift form once a project is set. This lets project work be planned at task level rather than only per project. The field is available on shifts that are linked to a project and is set from the shift form in the Planning app.

Why it matters Lets managers connect shifts to the project tasks they cover.

How to use it

  1. Open a shift in Planning.
  2. Set the project.
  3. Select the Task.
Odoo 20 · Planning
Shift form with the new Task field below Project
13
ImprovedEnterprise

Multiple resource assignment

Planning > Planning > All > shift

A single shift can have several resources, including employees and materials. Everyone and everything assigned to the shift shares the same time slot. This is set directly on the shift form by adding more than one resource. For example, a technician and the material they need can be booked on one shift. Planners add the resources from the shift form in the Planning app, and the shift then shows for each of them in the schedule.

Why it matters Lets planners staff one shift with several resources.

How to use it

  1. Open or create a shift in Planning.
  2. Add several resources to the shift.
  3. Save the shift.
Odoo 20 · Planning
Shift form with the multi-resource Resources field for employees and materials
14
NewEnterprise

Priority shifts

Planning > Planning > All > shift

Field service shifts have a priority level of Low, Medium, High or Urgent, displayed as stars. When Auto Plan runs, it handles higher-priority shifts first, so urgent interventions are assigned before less pressing ones. Field Service must be enabled in the Planning settings. The priority is set on the shift form by clicking the stars, and planners can rely on it so that the most important visits are handled first by the automatic planning.

Why it matters Ensures urgent shifts get scheduled first when using Auto Plan.

How to use it

  1. Enable Field Service in Planning > Configuration > Settings.
  2. Open a shift.
  3. Set the priority stars.
Odoo 20 · Planning
Shift form with the new star Priority field used by Auto Plan
15
NewEnterprise

Schedule shifts from side panel

Planning > Schedule > By Resource

The Gantt and Calendar views in Planning include a side panel listing shifts that still need to be scheduled, meaning items without dates such as service requests or sales order lines. A planner drags an item from the panel onto a resource and a time to schedule it. Planners reach this panel from the By Resource schedule and use it to turn waiting requests into dated shifts.

Why it matters Lets planners schedule shifts by dragging them onto the calendar or Gantt.

How to use it

  1. Go to Planning > Schedule > By Resource.
  2. Open the side panel of unscheduled items.
  3. Drag an item onto a resource and time.
Odoo 20 · Planning
Planning Gantt: unscheduled shifts side panel
16
NewEnterprise

Send shifts via WhatsApp

Planning > Configuration > Settings > Send Planning

A Send Planning setting lets the company choose whether schedules are sent by Email or WhatsApp. With WhatsApp selected, published schedules are delivered to employees' work phones using approved WhatsApp templates. The choice is made in the Send Planning section of the Planning settings and applies to schedules sent to employees. Employees then receive their published shifts through the selected channel, and the WhatsApp templates used must be approved.

Why it matters Lets managers send employee schedules directly through WhatsApp.

How to use it

  1. Go to Planning > Configuration > Settings.
  2. Find Send Planning.
  3. Select WhatsApp.
Odoo 20 · Planning
Planning settings: Send Planning option to send schedules via WhatsApp
17
NewEnterprise

Field Service: customer equipment

Planning > Planning > All > shift

Field Service tracks equipment, meaning serial numbers, installed at customers. Equipment sold with a running subscription is marked Maintained, and this ribbon appears on the equipment in the shift, on the serial number form and in the lists, so technicians know the visit is covered by a contract. A Documents smart button on the shift opens product documents such as manuals and datasheets for the equipment at the customer site.

Why it matters Lets technicians check maintenance contract coverage and equipment documentation from the shift.

How to use it

  1. Enable Field Service in Planning > Configuration > Settings.
  2. Enable Equipment and Maintenance Contracts.
  3. Open a shift with equipment under a running subscription.
18
NewEnterprise

Field Service: product barcodes

Planning > shift > Products > Scan button

The product catalog opened from an intervention has a Scan button. When a technician scans a product barcode, the product is added to the shift and is ready to be invoiced. This avoids searching the catalog by hand during a visit. It requires Field Service to be enabled and is used from an intervention in progress. The button is in the catalog reached through the Products button.

Why it matters Lets technicians add products to a shift quickly by scanning barcodes.

How to use it

  1. Enable Field Service in Planning > Configuration > Settings.
  2. Open an intervention in progress and click Products.
  3. Click Scan in the catalog and scan a barcode.
19
ImprovedEnterprise

Field Service: routing preferences

Planning > Maps > By Resource > Studio (Routing option)

Map views have a routing attribute with two values. Ordered draws the route following the records in their listed order, while optimized computes the shortest path. In Studio, this appears as a Routing option in the map view editor. The field service maps use the ordered mode, and a Mapbox token is needed for routes to be drawn. The setting belongs to the map view, not to the planning settings.

Why it matters Helps technicians follow routes in address order or along the shortest path.

How to use it

  1. Go to Planning > Maps > By Resource.
  2. Open Studio and the map view editor.
  3. Set the Routing option; ensure a Mapbox token is configured.
20
NewEnterprise

Gantt view: travel times

Planning > Configuration > Settings > Mapbox; Planning > Schedule > By Resource

When a Mapbox token is entered in the Planning settings, the Gantt view calculates the travel time and distance between consecutive interventions. These values are shown next to the shifts, and a popover gives the details. Planners use this information to leave enough time between visits when scheduling technicians. The travel information is displayed in the By Resource schedule, where shifts are shown per technician on the Gantt timeline.

Why it matters Helps planners schedule shifts realistically by showing travel times in the Gantt view.

How to use it

  1. Go to Planning > Configuration > Settings > Mapbox and enter a token.
  2. Open Planning > Schedule > By Resource.
  3. Hover the travel indicator between shifts for details.

8 new in Odoo 20

Project

8 features
21
ImprovedCommunity + Enterprise

Assign project roles

Project > Configuration > Project Roles

Each project role, such as Project Manager or Electrician, has a Team Members field. When a project is created from a template, the users listed on a role can be chosen for that role, and in Enterprise they are filled in automatically. Project managers set up roles once and reuse them when starting projects from templates. Roles are listed in Project > Configuration > Project Roles.

Why it matters Helps project managers staff each project role with the right team members.

How to use it

  1. Go to Project > Configuration > Project Roles.
  2. Add users in the Team Members column of a role.
Odoo 20 · Project
Project configuration: Roles
22
ImprovedCommunity

Collaborators separated from followers

Project > open project > gear icon > Share Project

Project collaborators are stored separately from followers. A customer can get portal access to a shared project with an access level of View, Edit or Advanced Edit without being made a follower, so they do not receive every notification. Project managers set this from the Share Project option in the project's gear menu. Collaborators can then work in the portal while notifications stay limited.

Why it matters Lets customers access projects in their portal without being added as followers.

How to use it

  1. Open a project and click the gear icon > Share Project.
  2. Add a portal contact.
  3. Choose View, Edit or Advanced Edit.
Odoo 20 · Project
Share Project dialog listing collaborators with their portal access level
23
NewEnterprise

Printable task schedule

Project > Tasks > Gantt view > gear icon > Print

The task Gantt view has a Print action in its gear menu. It prints the tasks of the period on screen as a PDF schedule. The action works with the Week or Month scale and is not available in the Day scale. It gives project managers a printable PDF of the planned tasks. The Print action uses the period currently displayed in the Gantt view.

Why it matters Lets teams print task schedules from the Gantt view.

How to use it

  1. Go to Project > Tasks and switch to the Gantt view.
  2. Use the Week or Month scale.
  3. Click the gear icon > Print.
Odoo 20 · Project
Task Gantt view action menu with the new Print option
24
RemovedCommunity + Enterprise

Profitability report

Project > Reporting > Margins or Forecast Margins

Project profitability is shown in dedicated reports instead of a panel on the project dashboard. Budget, actual margins and forecast margins have their own views: Margins and Forecast Margins under Project reporting, plus a project budget overview in Enterprise. Project managers and controllers use these reports to follow the financial results of their projects. The reports are found under Project > Reporting.

Why it matters Use the dedicated reports for project budget and actual or projected margins.

How to use it

  1. Go to Project > Reporting.
  2. Open Margins or Forecast Margins.
Odoo 20 · Project
Project Reporting menu with dedicated Margins and Forecast Margins reports
25
NewCommunity

Projects from opportunities

CRM > open opportunity > gear icon > Create Project

A 'Create Project' action on CRM opportunities turns an opportunity into a project based on a project template. After that, a smart button on the opportunity shows the linked projects and tasks. Sales teams handing over won deals to delivery teams can start the project straight from the opportunity. The link between the opportunity and its projects remains visible through the smart button.

Why it matters Lets teams start projects directly from CRM opportunities.

How to use it

  1. Go to CRM and open an opportunity.
  2. Click the gear icon > Create Project.
Odoo 20 · Project
CRM opportunity action menu with the new Create Project option
26
ImprovedCommunity

Assign tasks to portal users

Project > Tasks > open task > Assignees

Portal users can be selected as task assignees. Only portal users who collaborate on the project with Edit or Advanced Edit access appear in the Assignees list. This lets external collaborators, such as customers with portal access, be made responsible for tasks in a shared project. Portal users with only View access are not offered. The assignee is picked by typing the user's name in the task's Assignees field.

Why it matters Lets teams assign project tasks to external portal users who follow the project.

How to use it

  1. Share a project with a portal user using Edit access.
  2. Open a task of that project.
  3. Type the portal user's name in Assignees.
27
ImprovedCommunity

Mobile: improved task header design

Project > Tasks > open task (mobile)

On a phone, the title area of a task places the priority stars and the status on their own row above the task name. The task name can therefore use the full width of the screen. The same layout appears in a narrow browser window. Project users working on mobile see longer task names without them being cut short. It applies to every task.

Why it matters Makes tasks easier to read on mobile with a redesigned header.

How to use it

  1. Open Project > Tasks on a phone or narrow window.
  2. Open any task to see the header layout.
28
ImprovedCommunity

Task tracking in user portal

Portal > My Account > Tasks > open task

The task page in the customer portal shows tracking logs from the chatter, such as a change of stage. Customers following a task in a project shared with them can see what has happened to it. The logs appear on the task when the customer opens it from My Account > Tasks. Internal changes such as a stage update thus become visible to the customer on the portal.

Why it matters Keeps portal users informed of task changes logged in the chatter.

How to use it

  1. Change the stage of a task in a portal-shared project.
  2. Log in as the portal customer.
  3. Open the task under My Account > Tasks.

5 new in Odoo 20

Timesheets

5 features
29
NewEnterprise

ActivityWatch integration

Timesheets > Configuration > Settings; Timesheets > Assistant

Timesheets includes an Assistant page that reads the user's computer activity from ActivityWatch, a tracker that runs locally on the user's machine, and turns it into timesheet suggestions. The feature is switched on through the Timesheets Assistant setting, and the Assistant page offers a banner to install ActivityWatch. According to the item description, the tracked data stays private. The Assistant page is opened from the Timesheets menu once the setting is active.

Why it matters Saves employees time by turning tracked device activity into timesheets while keeping data private.

How to use it

  1. Go to Timesheets > Configuration > Settings.
  2. Enable Timesheets Assistant.
  3. Open Timesheets > Assistant and install ActivityWatch from the banner.
Odoo 20 · Timesheets
Timesheets Assistant prompting to install the ActivityWatch tracker for suggestions
30
ImprovedEnterprise

Timesheet assistant: sharing rules

Timesheets > Configuration > Timesheets Assistant > Assistant Rules

Each timesheet assistant rule has an Applies To setting that controls who uses it. The choices are Everyone, Departments with a list of selected departments, or Private, which keeps the rule for its author only. This lets teams share common tracking rules while users keep personal ones. The setting is found in the Applicability section of each rule, under the Timesheets Assistant configuration menu, where rules are created and managed.

Why it matters Lets users share timesheet assistant rules with colleagues or groups, or keep them private.

How to use it

  1. Go to Timesheets > Configuration > Timesheets Assistant > Assistant Rules.
  2. Open a rule.
  3. Set Applicability > Applies To.
Odoo 20 · Timesheets
Assistant rule Applies To options: Everyone, Departments or Private
31
ImprovedEnterprise

Timesheet assistant: side activities

Timesheets > Configuration > Assistant Rules > [Rule] > Tracking Behavior

An assistant rule can be flagged as a Side Activity. Activities that match such a rule, for example checking chat or email, are recorded as brief interruptions, and the project and task proposed for the main work done just before stay unchanged. This keeps brief distractions from breaking the timeline of the work being tracked. The option is in the Tracking Behavior section of each assistant rule in the Timesheets configuration menu.

Why it matters Lets employees record brief interruptions without disrupting their main timeline.

How to use it

  1. Go to Timesheets > Configuration > Assistant Rules.
  2. Open a rule.
  3. Tick Side Activity under Tracking Behavior.
Odoo 20 · Timesheets
Assistant rule form with the Side Activity option under Tracking Behavior
32
ImprovedEnterprise

Timesheet assistant: time thresholds

Timesheets > Configuration > Assistant Rules > [Rule] > Tracking Behavior > Threshold

Each timesheet assistant rule has a Threshold expressed in minutes. An activity matched by the rule only appears in the timesheet suggestions after it has lasted at least that long, which filters out very short activities that would clutter the list. The threshold is set separately for each rule in its Tracking Behavior section, under Timesheets > Configuration > Assistant Rules, so different activities can require different minimum durations.

Why it matters Keeps suggestions relevant by showing activities only after they pass a set duration.

How to use it

  1. Go to Timesheets > Configuration > Assistant Rules.
  2. Open a rule.
  3. Set the Threshold under Tracking Behavior.
Odoo 20 · Timesheets
Assistant rule form with the Threshold duration under Tracking Behavior
33
NewEnterprise

Log timesheets from anywhere

Top bar timer icon

A timesheet timer sits in the top bar and can be opened from any app. The user starts the timer, chooses a project and task, adds a description and creates the timesheet without leaving the current page. When Attendances is installed, the timer is reached through the attendance circle after checking in. The timer icon is available on every screen, so users can record time while working in another application.

Why it matters Lets employees track and log time from any app using the top-menu timer.

How to use it

  1. Click the timer icon in the top bar.
  2. Start the timer and enter description, project and task.
  3. Click Create.

3 new in Odoo 20

Helpdesk

3 features
34

Filter unanswered tickets

Helpdesk has a filter that finds tickets whose most recent message was written by the customer. Teams use it to spot tickets that are still waiting for a reply from the support side.

Why it matters Helps support teams find tickets still waiting for a reply to the customer.
Odoo 20 · Helpdesk
Helpdesk ticket search filters with the new Unanswered filter
35

Reminder email before auto-closing tickets

Before a ticket is closed automatically, the customer receives a reminder email. This gives the customer a chance to respond before the ticket is closed.

Why it matters Gives customers a chance to respond before their ticket closes automatically.
Odoo 20 · Helpdesk
Helpdesk team settings with the Auto-Close Reminder email option
36

Similar ticket detection

Helpdesk uses AI to detect tickets that are similar to one another. It then offers the support team suggested answers based on those similar tickets.

Why it matters Helps support teams answer faster using AI-suggested answers from similar tickets.
Odoo 20 · Helpdesk
Helpdesk team settings with the new AI option Look for Similar Tickets

1 new in Odoo 20

Field Service

1 features
37
ChangedEnterprise

Field Service merged into Planning

Planning > Maps (By Resource, Timeline)

Odoo 20 has no separate Field Service app. Field service is provided inside Planning by the planning_field_service module. Interventions are Planning shifts that carry a customer and an address. Planning gains a Maps menu (by resource, timeline and live map), and worksheets, reports and stock are added through planning_field_service_* modules. Dispatchers and technicians work on interventions from Planning. Maps offers By Resource and Timeline views.

Why it matters Use the Planning app for field service features, as the standalone app is discontinued.

How to use it

  1. Open Planning.
  2. Click the Maps menu and choose By Resource or Timeline.
Odoo 20 · Field Service
Planning app Maps menu with By Resource, Live Map and Timeline

put it to work

Implement Odoo 20 Projects & Services

keep exploring

Odoo 20 in other business areas

Odoo 20 Projects & Services questions

  • How many new Projects & Services features are in Odoo 20?

    37 across 5 apps, 6% of the 637 new features in the release by TechUltra's count. By app: Planning (20), Project (8), Timesheets (5), Helpdesk (3), Field Service (1).

  • What are the biggest Projects & Services changes in Odoo 20?

    In Planning, schedule shifts from side panel: lets planners schedule shifts by dragging them onto the calendar or Gantt. In Project, assign project roles: helps project managers staff each project role with the right team members. In Timesheets, timesheet assistant: time thresholds: keeps suggestions relevant by showing activities only after they pass a set duration.

  • How do we get the Odoo 20 Projects & Services features?

    If you run Odoo 16, 17, 18 or 19, they arrive with the upgrade to Odoo 20. A free written assessment lists your modules, the risks in your build and a fixed price. If you are new to Odoo, start directly on Odoo 20 with a fixed-price implementation, priced after a one-week discovery.

Sources: features, steps and the 29 screenshots are from TechUltra's Odoo 20 feature guide. Counted by TechUltra's Odoo team from the Odoo 20 source code and a live Odoo 20 database; industry packages are based on Odoo's official release notes. Localization changes are not included.

ready when you are

Planning your move to Odoo 20?

Book a free 30-minute call with a TechUltra senior consultant for a process review or a clear upgrade path from Odoo 16, 17, 18 or 19.