How production planning works in Odoo 20: draft manufacturing orders, ASAP planning, the work order Gantt, continuous production, the Shop Floor app, bills of materials and MO costs, with the menu path for each step.

Odoo 20 production planning: manufacturing orders, work orders and the Shop Floor app

Odoo 20 changes how a production planner spends the day more than how the screens look. Orders can wait as drafts until someone checks them. Scheduling goes to the earliest free capacity with one click. The shop floor gets scanning and formatted instructions. Cost shows in one column instead of three places.

This article follows that day in order: plan, schedule, run the shop floor, then cost and report. Each step gives the menu path, and whether it works in Odoo Community or needs Enterprise. For all 83 inventory, purchase, barcode, quality, maintenance and manufacturing changes, with screenshots, see our Odoo 20 inventory and manufacturing guide. Every feature here comes from that guide.

1. Plan: draft manufacturing orders a planner can review

In earlier versions, replenishment created confirmed manufacturing orders (MOs) and reserved components straight away. Odoo 20 lets you stop that.

  • Draft MOs from replenishment (Community). Go to Inventory > Configuration > Operation Types, open Manufacturing and untick Auto Confirm Production. Reordering rules and make-to-order now create MOs as drafts. Components are reserved only once a planner confirms the order. See the feature.
  • Review drafts on the schedule (Enterprise). Draft MOs can be planned and appear in the work order Gantt under Manufacturing > Planning > Work Orders > Planning. One Confirm Planning button confirms every draft shown, so you see how the week fits capacity before you commit. See the feature.
  • See the week’s load (Community and Enterprise). The MO Kanban groups orders by week of their scheduled date. Each card shows component status, the active work center, the deadline and remaining time, and each week’s header totals the remaining time.

Why it matters: with automatic replenishment on, a planner used to fix bad orders after components were already tied up. Drafts move that check before reservation.

2. Schedule: ASAP planning, the Gantt and continuous production

  • Plan as soon as possible (Community and Enterprise). Select confirmed MOs in the list and click Plan. Odoo 20 schedules them from the current time at the earliest free capacity. Several orders are queued in the order they appear in the list, so sort the list by priority first. See the feature.
  • Work order views (Community and Enterprise). Planning > Work Orders > Kanban groups work orders. The Gantt supports drag and drop with clearer colours and keeps completed work orders visible. Planning > Employees > Planning shows work orders per employee. See the feature.
  • Backorders planned for you (Community and Enterprise). Produce part of a planned MO and create a backorder for the rest. The backorder’s work orders get work center slots straight away, with no second click on Plan. See the feature.
  • Continuous production (Community and Enterprise). On a bill of materials (BoM) with operations, tick Continuous Production in the Miscellaneous tab. The next operation can then start once part of the quantity is recorded on the earlier work order, before that one is finished. For multi-step routings this cuts total lead time. See the feature.
  • Work center shortcuts (Community and Enterprise). In Manufacturing > Overview > Work Centers Overview, each card’s menu opens Plan Orders, that work center’s Gantt and, with Maintenance installed, its maintenance planning.

Maintenance and production now meet on the same timeline. Maintenance requests have Gantt views by equipment and, when Manufacturing is installed, by work center (Enterprise). See the feature.

3. Run the shop floor: one Produce button, scanning and better instructions

  • One Produce button (Community and Enterprise). It produces the quantity you set, or the whole order if you set none, and asks about a backorder when needed. It behaves the same in Manufacturing, Shop Floor and Barcode, so operators learn one action.
  • Scan to switch work center (Community and Enterprise). Fill the new Barcode field on each work center (Manufacturing > Configuration > Work Centers). In Shop Floor, scanning it opens that work center’s tab, the same way scanning a badge selects the operator. See the feature.
  • Formatted instructions (Community and Enterprise). The MO note is now Additional Notes, a rich-text field that takes its default from the BoM note. It accepts bold text, lists, links and pictures. Shop Floor shows the formatted note on the order card, and operators can edit it there. See the feature.
  • Correct an instruction without retyping it (Enterprise). In Shop Floor, Add/Modify Step > Update Instructions opens with the current text pre-filled. The operator fixes a few words and submits it as a proposal. See the feature.
  • Split without a wizard (Community). On an MO in progress, Gear menu > Split keeps the quantity being produced and moves the rest to a backorder at once.
  • Lots and serials generated on close (Community). If an operator closes an MO for a lot-tracked or serial-tracked product without entering a number, Odoo creates it.
  • Flexible consumption everywhere (Community). The BoM consumption restriction setting is gone. If consumed quantities differ from the BoM, Odoo shows a warning the user can confirm. It informs and does not block. Check this before upgrading if you relied on strict consumption to stop errors.

4. Cost and report: MO cost, extra cost and production analysis

  • One MO Cost column (Community and Enterprise). The MO Overview shows planned cost while the order is open and real cost once it is done. For a component bought from a subcontractor, the line adds the cost of the subcontracted BoM components to the vendor price. See the feature.
  • Only what is missing (Community). The MO Overview’s To Replenish toggle hides components that are already available, leaving the list of what still has to be bought or made.
  • Fixed extra cost per unit (Community and Enterprise). A BoM’s Miscellaneous tab has an Extra Cost field that adds a fixed cost per unit to every order from that BoM. See the feature.
  • Where the cost comes from (Community and Enterprise). Manufacturing > Reporting > Production Analysis breaks the cost per unit into components, work centers, subcontracting, employees and operations, next to the quantity produced. See the feature.

5. Bills of materials and engineering changes

Planning is only as good as the BoM underneath it.

  • Compare BoMs (Community and Enterprise). Select two or more BoMs and choose Actions > Compare BoMs: a pivot table with one column per BoM and one row per component. With Forecast on, the BoM Overview shows availability, the quantity to buy or make, or an estimated date in one Status column.
  • Replace a part everywhere (Community). The Used In button on a component lists every BoM line that uses it. Edit the quantity or replace the component across several BoMs at once.
  • Engineering change orders (Enterprise). In PLM, the Review button on an engineering change order (ECO) opens one summary of every component and operation change, with the cost impact of each line and a total. See the feature.

Community or Enterprise: what you get

Step Community Enterprise only
Plan Draft MOs from replenishment, weekly MO Kanban Confirm Planning on the Gantt
Schedule ASAP planning, work order views, continuous production, automatic backorder planning Maintenance Gantt by work center
Shop floor Produce button, work center barcode, rich-text notes, split, lot generation Update Instructions
Cost MO Cost, To Replenish, Extra Cost, Production Analysis —
BoM Compare BoMs, Used In replacement ECO review report

Before you switch on these features

  • Decide who confirms orders. Draft MOs only help if someone owns the daily review. Otherwise orders wait while components are not reserved.
  • Sort before you Plan. ASAP planning queues orders in list order, so sort the list by priority first.
  • Give each work center a barcode before you train operators on scanning.
  • Recheck consumption controls. Flexible consumption is now the only mode. If you used strict consumption as a quality gate, move that control to quality checks.

If you run manufacturing on Odoo 17, 18 or 19, these changes come with an upgrade. Our Odoo 20 upgrade service starts with a free written assessment of your custom modules. For a new implementation, see Odoo ERP for manufacturing.

Frequently asked questions

  • How do you plan manufacturing orders in Odoo 20?

    Select confirmed manufacturing orders in the list and click Plan. Odoo 20 schedules them as soon as possible, from the current time, at the earliest free work center capacity, and queues several orders in the order they appear in the list. Check the result in Manufacturing > Planning > Work Orders > Planning.

  • Can Odoo 20 create manufacturing orders as drafts?

    Yes. Untick Auto Confirm Production on the Manufacturing operation type (Inventory > Configuration > Operation Types). Orders created by reordering rules or make-to-order then arrive as drafts, components are reserved only once an order is confirmed, and Enterprise users can plan the drafts in the Gantt and confirm them all with Confirm Planning.

  • What is continuous production in Odoo 20?

    A bill of materials option in the Miscellaneous tab. When it is ticked, a following operation can start once part of the quantity is recorded on the earlier work order, before that operation is complete. It shortens the total lead time of multi-step production.

  • What changed in the Odoo 20 Shop Floor app?

    Work centers have a Barcode field, so operators switch work center by scanning it, as they select themselves by scanning a badge. The manufacturing order note is now formatted text that Shop Floor shows on the order card. Update Instructions opens with the current instruction pre-filled. A single Produce button behaves the same in Manufacturing, Shop Floor and Barcode.

  • How does Odoo 20 show manufacturing costs?

    The MO Overview has one MO Cost column: planned cost while the order is open, real cost once it is done, including subcontracted components. Manufacturing > Reporting > Production Analysis breaks the cost per unit down into components, work centers, subcontracting, employees and operations. A bill of materials can also carry a fixed Extra Cost per unit.

  • Are these features in Odoo Community or only Enterprise?

    Most are in both. ASAP planning, continuous production, the work order views, MO cost and Production Analysis are Community and Enterprise. Draft manufacturing orders, splitting and resetting orders are Community. Confirm Planning in the Gantt, Update Instructions in Shop Floor, the maintenance Gantt and the ECO review report need Enterprise.

Related services & solutions

Put this into practice with TechUltra's senior Odoo consultants.

Tags Odoo 20 Manufacturing Production planning Shop Floor

Planning an Odoo project?

Get a free 30-minute scoping call with a senior Odoo consultant — no sales pitch, just straight answers on scope, timeline, and cost.