Skip to main content
TechUltra Solutions Pvt. Ltd. — AI-Enabled ERP Transformation
Book a free call
Menu
Available at launch Use case · illustrative

No order promised that the shop floor can't make, and no line stopped for a missing part.

“We confirm orders and then find out a casting is 3 weeks away. Our standard costs are two years old. Scrap is high on some lines and nobody knows why.”

One missing component stops a whole manufacturing order. Sales promises dates without checking materials. BoM costs drift while selling prices stay the same.

Last reviewed:

The business

Illustrative example
  • An engineering-components maker with 2 plants
  • 900 BoMs, 250 raw materials, make-to-order plus make-to-stock lines
  • Odoo 18 Enterprise with Manufacturing, Purchase, Inventory and Quality

Free reading · 48 hours

Illustrative example

What the free reading found

Sale orders confirmed with components short on the planned date
61 orders, average 11 days late
BoMs whose component cost rose more than 10% while the sale price didn't change
74 BoMs, ₹18 lakh margin a year TODO(Kazim): USD figure
BoM components with no vendor set
29 components
Manufacturing orders over standard time
22% of orders on line 3
Scrap above the median on 6 products
₹6 lakh in 90 days TODO(Kazim): USD figure

What Erpmate does every day

  • Guard

    Available at launch
    • On quotes: checks component availability and real lead time before the delivery date is promised.
    • On manufacturing orders: warns when components won't be there on the planned start date.
  • Operations

    Available at launch (basic)
    • Proposes reorder points for long-lead raw materials, chases late POs for components that block MOs, and flags vendors who are consistently late.
    • Manufacturing watch (read-only): late MOs, work orders over standard, BoM cost drift, scrap above median, and the root cause of delays.
  • Sales

    Coming next
    • Customer spec sheets and drawings captured against the deal, so the quote is checked against the customer's stated requirements (for example, "customer asked for SS304, quote says MS").
    Join the early list for the Sales agent

Goals the owner tracks

Illustrative example
  • On-time delivery

    Above 92%

  • MOs started short of components

    None

  • BoM cost review

    When drift exceeds 5%

Safe by design

  • Approve first

    Nothing runs that you did not approve.

  • Shadow mode

    Every rule practises before it acts.

  • Undo everything

    An undo is stored before any write.

  • A "why" for every action

    The rule, the evidence and the limits checked.

How Erpmate keeps your Odoo safe

See what your Odoo is hiding.

Free. Read-only. Report in 48 hours.